New Build Homes with Parking in London
✅ 700 new build developments in London with Parking from 311 developers✅ 211,166 new homes for sale with Parking across 700 developments in London
Augustus House
by McCarthy & StoneModern four storey managed retirement building with lift, landscaped gardens, restaurant, lounge, guest suite, 24 hour management and strong travel connections
Ransome's Wharf
by London Square Battersea ParkModern riverside building with refined design, natural light, landscaped walks, nearby cafes, schools, gyms, parks and strong long term investment potential
Audley Fairmile
by Audley Low rise new build with 74 two bedroom homes, landscaped gardens, club with pool, health club, restaurant and fully managed communal areas for secure later living
Branson House
by Not yet determined Hounslow East Modern new build with 1, 2 and 3 bedroom layouts, secure access, lift, balconies, cycle racks and fast connections, close to shops, schools, parks and gyms
Lower Mill Apartments
by Birchgrove Ewell WestLow rise senior living building with 53 one and two bedroom homes, river and garden outlooks, wide halls, walk in showers, shared dining, bar, gym and gardens
Pike Close
by Countryside Homes Grove Park Modern eight storey development with 209 homes, gardens, gym, daycare, cafes, parking and walking paths, close to parks, schools, shops and rapid city links
Southbank Place
by Canary Wharf Group WaterlooRiverfront landmark with landscaped courtyards, cafes, health club, infinity pool, gym and secure modern systems, offering culture, comfort and long term appeal
Chelsea Waterfront
by Cheung Kong Property Holdings Imperial Wharf A 37 storey riverside landmark with glass facade, landscaped gardens, spa, pool, gym, private restaurant, fine interiors and 24 hour concierge service
Feature 17
by Countryside Homes Wood Street Modern mixed use building with landscaped courtyards, shops, cafes and green routes, bright glass fronted homes, cycle storage, parking and strong transport links
Hallsville Quarter
by Bouygues Development Canning Town Modern mixed use development with shops, gyms, parks and health care nearby, walkable design, strong transport links and long term investment growth potential
Hayes Park
by Shall Do Hayes Development HillingdonHeritage Grade II architecture, modern amenities, gym, cinema, co-working, gardens, shuttle, nearby parks, schools, shops and healthcare make this a smart long term buy
Goldfinch House
by McCarthy & Stone ChipsteadModern low rise retirement building with landscaped gardens, lounge, guest suite, underfloor heating, secure entry and 24 hour call system for comfortable later living
London New Build Developments with Parking
Secure parking is a premium feature in London’s new build market, offering residents the convenience and safety of dedicated vehicle storage. Modern developments provide a range of options, from secure underground garages with gated access to surface parking and electric vehicle charging points.
London currently features 700 developments with professional parking facilities. These spaces offer a significant advantage in the capital’s congested city centre, ensuring ease of access and supporting the long-term value and resale potential of the property for both residents and investors.
FAQ: New Build Homes with Parking in London
No, parking is often sold as a separate option or reserved for larger units (such as three-bedroom apartments and penthouses). In many Central London developments, "car-free" policies mean that parking is only available to Blue Badge holders or as part of a limited number of spaces sold by separate negotiation.
Secure underground parking provides a high level of safety through gated fob access, CCTV monitoring, and restricted pedestrian entry. It also protects vehicles from the elements and vandalism, which is particularly valuable in a high-density urban environment like London.
Yes, current London planning regulations require a significant percentage of parking spaces in new developments to feature active or passive electric vehicle charging points. This ensures that the building is future-proofed for the transition to electric transport.